Elongation | 7% |
Full Cure Schedule | 7 days @ 23 Degree C, 90 minutes @ 70 Degree C, 30 minutes @ 93 Degree C |
Glass Transition Temperature (Tg) | 58 Degree C RT Cure, 72 Degree C Ultimate |
Handling Strength Time and Temperature | 4 -6 hours @ 23 Degree C/50 psi overlap shear strength |
Hardness | 80 Shore D |
Mix Ratio Volume Base:Accelerator | 2:1 |
Peel Strength | 50 piw on Aluminum @ 180 Degree C |
Product Series | EJ0210 |
Shear Strength | 4,600 psi on Aluminum |
Substrates | Magnet, Metal, Plastics (Polyamide, Polycarbonate, PC/ABS) |
Viscosity | Mixed 15,000 to 25,000 cps @ 23 degree C |
Worklife Time and Temperature | 60 minutes @ 23 Degree C |
Elongation | 7% |
Full Cure Schedule | 7 days @ 23 Degree C, 90 minutes @ 70 Degree C, 30 minutes @ 93 Degree C |
Glass Transition Temperature (Tg) | 58 Degree C RT Cure, 72 Degree C Ultimate |
Handling Strength Time and Temperature | 4 -6 hours @ 23 Degree C/50 psi overlap shear strength |
Hardness | 80 Shore D |
Mix Ratio Volume Base:Accelerator | 2:1 |
Peel Strength | 50 piw on Aluminum @ 180 Degree C |
Product Series | EJ0210 |
Shear Strength | 4,600 psi on Aluminum |
Substrates | Magnet, Metal, Plastics (Polyamide, Polycarbonate, PC/ABS) |
Viscosity | Mixed 15,000 to 25,000 cps @ 23 degree C |
Worklife Time and Temperature | 60 minutes @ 23 Degree C |